Contemporary commercial building at completion, in warm morning light

Construction closeout documents

The project isn’t
finished until
the paperwork is.

Send us the warranties, manuals and drawings your trades turned in. We sort, index and gap-check them into one handover package your owner can actually use.

01 / COLLECT02 / ORGANIZE03 / HAND OVER

Closeout package explorer

Sample project · Harbor Office / Building A

Synthetic files · Interactive previewNo project certification

The last mile of a project

Substantially complete.
Administratively unfinished.

Files arrive in different formats, from different trades, at different times. Someone still has to make the handover make sense.

THE CLOSEOUT DESK APPROACH

A considered handover.
Not a folder dump.

We sort every supplied document, flag what’s missing against your closeout list, and hand back a package your team can review before turnover.

A simpler way forward

A clear process.
A considered finish.

01

Send what you have

After checkout, share your closeout requirements and the files collected so far.

02

We assemble and index

Every document sorted by trade and system, named consistently, with a running list of what’s still missing.

03

Review and hand over

You review the package, we finalize it for turnover. Technical sign-off stays with your team.

The package, made legible

All the final details.
In a deliberate order.

Every package follows your closeout requirements. Most include these four sections.

CD / 01

Warranties

ILLUSTRATIVE SAMPLE

Warranties

Manufacturer and installer files, indexed by trade or system.

CD / 02

O&M manuals

ILLUSTRATIVE SAMPLE

O&M manuals

Operating and maintenance information supplied by the project team.

CD / 03

As-built drawings

ILLUSTRATIVE SAMPLE

As-built drawings

Supplied record drawings, organized by discipline and revision.

CD / 04

Turnover records

ILLUSTRATIVE SAMPLE

Turnover records

Test reports, start-up records, and other agreed handover files.

PACKAGE REVIEW / SAMPLE
01Mechanical warrantiesReceived
02Air handling unit O&MIndexed
03Electrical record drawingsRequested
04Owner turnover checklistFor review

Illustrative tracking only. Your project team confirms technical completeness.

A workflow with an owner

Know what’s here.
Know what’s missing.

A closeout package is only useful when the next person can navigate it. A working index and a clear exception list make the handover easier to review.

  • Document naming and category structure
  • Agreed checklist and missing-items register
  • Review version, then final handover structure
  • Original source files kept intact

For project teams

Built for the team
closing the loop.

General contractors

Hand off the paperwork at the end of the job so your PM can move on.

Construction managers

A structured package and exception list for your review process.

Owners & facility teams

A package you can still find things in years after turnover.

Priced per project

One project.
One clear price.

Pay once per closeout package. Choose by project size; you can send the files as soon as checkout is done.

Essential

Small project

$199per project

  • Supplied documents organized and indexed
  • Checked against your closeout list
  • Missing-items list
  • Delivered as an indexed package
Opening soon

Complex

Large or multi-building

$999per project

  • Everything in Standard
  • Organized by building and discipline
  • Two review rounds
  • Turnover records summary
Opening soon
  1. 01Check out securely with Stripe.
  2. 02Send your closeout requirements and the files collected so far.
  3. 03Review your indexed package and missing-items list.

Checkout opens soon. Secure checkout by Stripe. Closeout Desk organizes supplied documents. It does not engineer, certify, or verify construction documentation.

Before you decide

What project teams
ask first.

What do you need to start?

Your closeout requirements or spec section, the files you’ve collected so far, who receives the package, and your target turnover date.

Do you chase missing files from subcontractors?

Every package includes a running missing-items list, so you know exactly who still owes what. Tell us after checkout if you’d like us to contact subcontractors directly.

Can you use our templates?

Yes. Send your naming convention, checklist or index format after checkout and we’ll build the package to match.

Do you prepare or certify as-built drawings?

No. We organize drawings supplied by qualified project participants. We do not produce engineering work, certify drawings, or verify field conditions.

How long does a package take?

It depends on file volume and how much is still missing. We confirm your delivery date by email once we’ve reviewed your files.

Final details, handled

Bring the project
to a considered close.

Choose the package size, check out, and send the closeout list and files you already have.

Choose a plan